A lot of money in infrastructure it seems like. They are also redoing the
Mar 28, 2024, 9:54 AM
|
|
highway 17 bridges going out of Georgetown.
|
|
|
|
|
Oculus Spirit [82014]
TigerPulse: 100%
Posts: 56812
Joined: 9/13/04
|
I've gone over those about 6 times in the last 6 months
Mar 28, 2024, 10:13 AM
|
|
I see where there was work happening, but never anyone actively doing anything.
|
|
|
|
|
Oculus Spirit [98363]
TigerPulse: 100%
Posts: 65254
Joined: 7/13/02
|
Lol. They have somehow managed to screw up the biggest project.
1
Mar 28, 2024, 10:14 AM
[ in reply to A lot of money in infrastructure it seems like. They are also redoing the ] |
|
the $1.6 billion "Carolina Crossroads" project is dead in the water, for a while anyway.
DOT first put the project up for bids after picking a plan from among many proposals. I think they chose the cheapest, go figure. When they put it up for bids at $1.6 billion, NO ONE, not a single company, made a bid for the job. Wonder why?
Anyway, they then split the job into like 4-5 sections, and then put those 4-5 sections up for bids, and they got bidders and signed contracts. They have already started work on two sections of the project, and several bridges have already been built. BUT, the most important section, smack in the middle of malfunction junction, they learned that section would go WAY over budget because the original contract had not taken into account relocating infrastructure in the area. So they have shitcanned the most important section of the project (back to the drawing board), that all other sections tie into, until they can come up with an alternate plan. Again, they ALREADY HAVE BRIDGES BUILT to tie into a section of the project that's been put on hold.
I wish I were making this up. But, I'm not.
Oh, and the I-26 widening project going towards Greenville, the first section is complete, but it's still two lanes. Want to know why? Because DOT asked the contractor to do work outside and beyond the scope of the contract, since they were already in the area. The contractor did the work, over $3 million worth of extra work, and DOT has refused to pay them. So, the contractor is keeping the lanes closed until DOT pays what they owe.
Meanwhile, the state has $1.8 billion sitting in an account and they can't figure out where it came from?
Anyway, I'm beyond done here. I fully retract my Tennessee dig yesterday. Obed®
|
|
|
|
|
Heisman Winner [120960]
TigerPulse: 100%
Posts: 54955
Joined: 6/24/09
|
SC DOT is worthless
Mar 28, 2024, 10:28 AM
|
|
30-40 years ago we thought we had the best roads in the country. They looked nice but we find they were actually built poorly.
|
|
|
|
|
Oculus Spirit [98363]
TigerPulse: 100%
Posts: 65254
Joined: 7/13/02
|
In fairness to SCDOT this was more due to our gas tax than anything else
Mar 28, 2024, 10:37 AM
|
|
SC spent two decades with some of the lowest gas taxes in the country. Problem is that tax is used to fund roads and infrastructure, and we failed to fund what was necessary for growth.
Meanwhile, decades ago GA and NC raised their gas taxes, and have spent billions more on roads than SC. And drive to NC or GA and you see the results, MUCH better roads. So the state legislature FINALLY decided to raise the tax, to match GA and NC. The gubnah vetoed the tax increase because he knew it would be overridden by the legislature, and it was. So our gas prices match NC and GA now. But our roads are still crap. Why? because for 20 YEARS NC and GA improved their roads with billions of extra dollars from their higher gas tax. Simply matching their gas tax doesn't and won't bring our roads up to par with them, it will simply stop the decline of our roads relative to their roads.
Nope, to have roads and infrastructure to match GA and NC, SC has to either raise our gas tax higher than NC and GA to the extent they were once higher than SC, OR....what we're doing, throw covid money into the pot, and maybe the $1.8 billion we found laying around.
|
|
|
|
|
Oculus Spirit [79708]
TigerPulse: 100%
Posts: 63373
Joined: 10/30/05
|
You could raise the gas tax to $10 a gallon and it wouldn't solve the
1
Mar 28, 2024, 11:34 AM
|
|
#### poor job SCDOT does.
|
|
|
|
|
Oculus Spirit [98363]
TigerPulse: 100%
Posts: 65254
Joined: 7/13/02
|
Well, there's that too. But it would take a miracle to catch up to
Mar 28, 2024, 12:49 PM
|
|
NC and GA roads, even with our current tax. But then again $1.8 billion "found" and whatever we have from covid, that's a heck of a lot to add, so there's hope I guess.
|
|
|
|
|
110%er [6436]
TigerPulse: 100%
Posts: 11160
Joined: 6/5/03
|
Re: Lol. They have somehow managed to screw up the biggest project.
Mar 28, 2024, 10:54 AM
[ in reply to Lol. They have somehow managed to screw up the biggest project. ] |
|
"When they put it up for bids at $1.6 billion, NO ONE, not a single company, made a bid for the job. Wonder why?"
The reason they couldn't get bids is because done as one project, it would have taken about 10 years. No contractor is going to bid on a project that long because there's no way to know what material costs will be that far out.
|
|
|
|
|
All-In [47114]
TigerPulse: 100%
Posts: 30935
Joined: 8/11/15
|
There's a bridge in the Pee Dee that has been under construction for 2 years
Mar 28, 2024, 12:23 PM
[ in reply to Lol. They have somehow managed to screw up the biggest project. ] |
|
now. Lane changes, cones, everything. 0 workers ever. Once a week they go and change the location of the truck that's out there so it looks like somebody has done something. Never seen a worker.
|
|
|
|
|
Oculus Spirit [82014]
TigerPulse: 100%
Posts: 56812
Joined: 9/13/04
|
SCDOT has been working on some section of I-85 consistently since at least 1986
Mar 28, 2024, 12:52 PM
|
|
I don't recall a time they haven't been working on it.
|
|
|
|
|
Legend [17597]
TigerPulse: 100%
Posts: 14463
Joined: 12/14/98
|
Grew up at North CHS and first job out of college was at Westvaco
1
Mar 28, 2024, 10:00 AM
|
|
Feeling a little old.
|
|
|
|
|
Oculus Spirit [98363]
TigerPulse: 100%
Posts: 65254
Joined: 7/13/02
|
FeelOldPost. kthx.
Mar 28, 2024, 10:02 AM
|
|
I'm older than 526 and the Don Holt bridge.
|
|
|
|
|
Oculus Spirit [82014]
TigerPulse: 100%
Posts: 56812
Joined: 9/13/04
|
They made it about 1/2 as long as the cooper river bridge***
Mar 28, 2024, 10:07 AM
|
|
|
|
|
|
|
Lot o points [182526]
TigerPulse: 100%
Posts: 95439
Joined: 12/5/10
|
Talmadge Bridge will be raised 20 feet higher in the middle.
Mar 28, 2024, 10:26 AM
|
|
Would cost $2 Billion to replace.
|
|
|
|
|
Orange Blooded [2730]
TigerPulse: 97%
Posts: 3436
Joined: 7/3/07
|
The Wando Bridge isn't any better***
Mar 28, 2024, 10:53 AM
|
|
|
|
|
|
|
All-In [47114]
TigerPulse: 100%
Posts: 30935
Joined: 8/11/15
|
Let's just nuke every bridge going into Charleston and the surrounding areas
Mar 28, 2024, 12:24 PM
|
|
and let the Ohioans have it.
|
|
|
|
|
Oculus Spirit [82014]
TigerPulse: 100%
Posts: 56812
Joined: 9/13/04
|
The north Wando Bridge? I haven't been over it in a while, but its <5 years old
Mar 28, 2024, 12:53 PM
[ in reply to The Wando Bridge isn't any better*** ] |
|
Is it already messed up?
|
|
|
|
|
Legend [16766]
TigerPulse: 100%
Posts: 16781
Joined: 8/19/04
|
Re: Weird timing due to the bridge in Maryland, but looks like CHS is
Mar 28, 2024, 4:32 PM
|
|
SPA bought the former paper mill just north of the don holt to expand port operations. The clearance of don holt is 155’. Ravenel clearance is 185’. Don holt needs to be higher for container ships to reach old paper mill site. By the way Savanah is also replacing the Talmadg bridge
|
|
|
|